EV Kube in Action
Charge-M8 EV Kube Installation Cases
6 x Easee 22kW Chargers Installed Faster with EV Kube Foundations
EV Kube pairs seamlessly with Easee chargers and epark engineering multi posts for a faster, cleaner rollout
This installation features 6 x Easee Charge 22kW units mounted on epark engineering dual posts, using Charge-M8 EV Kube as the foundation solution. Products were sourced via EVelec Limited through a Kelvelec Electrical Supplies Ltd bundle.
EV Kube proved its compatibility in a demanding, multi-unit rollout. Working alongside Easee 22kW chargers and epark engineering dual posts, it delivered a clean, professional result with no groundworks delays and no heavy plant required.
- Direct compatibility with Easee Charge 22kW chargers and epark engineering dual posts
- No groundworks delays: faster programme and lower total project cost
- Bundled procurement made straightforward through established wholesaler relationships
- Consistent, repeatable installation across all six units on the same visit
- "We've already done a dry fit with some of them, we think they're great."
- "Building them now. Decent kit."
- EV Kube described as "solid, well built, and easy to manoeuvre".
An Installer Chooses a Greener Foundation for EV Charging
Flat-pack delivery, one-person assembly, no concrete: a smarter way to get the job done
Traditional EV charger foundations arrive heavy, require specialist handling, and demand concrete pours that add days to a programme. EV Kube takes a different approach: it ships flat, assembles quickly, and is ready for use without a single wet pour or heavy lift.
This installation shows what that looks like in practice, from the moment the pallet arrives on site to the moment the charger is commissioned.
- Assembly-ready delivery fits a standard pallet and reduces transport costs
- One person can assemble and place the unit without lifting equipment
- No concrete required: no mixing, no curing time, no site disruption
Removing concrete from the equation reduces the carbon footprint of every installation EV Kube is part of. The recyclable composite material ensures the product aligns with responsible infrastructure delivery from manufacture to end of life.
My Trusted Electrical Chooses EV Kube as Their New Foundation Partner
A values-led decision: environmentally responsible, installer-friendly, and built for rapid deployment across multiple sites
My Trusted Electrical chose EV Kube not just because it makes installations faster and easier, but because it reflects how they want to work. As a team committed to clean, professional delivery, they needed a foundation product that shared those standards: low environmental impact, no unnecessary complexity, and consistent performance across every site.
Their April 2026 rollout spans multiple locations, with EV Kube performing reliably across all of them.
EV Kube is manufactured from recyclable composite materials and eliminates the need for wet concrete entirely, reducing both the carbon cost and the physical disruption of every project it is part of. For My Trusted Electrical, that alignment with responsible infrastructure delivery was central to their decision.
- No concrete pours: zero curing time, zero associated carbon impact on every site
- Recyclable composite materials support ESG reporting and responsible procurement
- A product that supports the case for greener EV infrastructure across the UK
- One-person assembly: no plant, no extra crew, no scheduling delays
- Consistent handling and installation process repeated cleanly across multiple locations
- Designed by a UK manufacturer that understands how installers actually work
Trusting Charge-M8 means trusting a product that is innovative, environmentally responsible, and designed for real installers, not just specification sheets.
EV Kube Compatibility and Partner Ecosystem
EV Kube integrates with leading EV charger brands, multi-post systems, and complete charging solutions across the UK. Below are three proven combinations, each highlighting what the partner product brings to the installation.
EV Kube + epark engineering Multi Post
Faster installs. Cleaner layouts. Future-ready upgrades.
- UK-manufactured stainless steel construction built for long-term outdoor durability
- Slip-on replacement barrier: swap a damaged section without removing the post
- PAS-compliant and suited to public and commercial environments
- Bespoke mounting plates accommodate a wide range of charger brands and configurations
This pairing makes future-proofing straightforward. Install today. Upgrade tomorrow.
The Complete EV Charging Ecosystem
NexBlue Delta Max + epark Multi Post + EV Kube: three British innovators, one complete installation.
- Adaptive 1.4 to 22kW smart charging
- Built-in MID-certified metering for billing accuracy
- Dynamic Load Management across multiple units
- PEN-fault protection for safety compliance
- ISO 15118 plug-and-charge ready
- UK manufactured stainless steel
- PAS-compliant barrier system
- Bespoke mounting plates for any charger
- Slip-on barrier replacement without post removal
Together, this ecosystem reduces groundworks, speeds up commissioning, and supports future compliance without added complexity.
EV Kube + Ratio EV Charger
Modular foundations that adapt across brands
- Clean, compact design suited to residential and light commercial environments
- Simple mounting and connectivity for fast commissioning
- A proven performer across a wide range of EV models
- Designed to be straightforward for installers and end users alike
This combination confirms that EV Kube is compatible with a wide range of chargers and pedestals, making it a flexible foundation for any site.
The Smarter Foundation for Every EV Installation
EV Kube is a UK-manufactured composite foundation system engineered to replace traditional concrete groundworks on EV charger installations. Compatible with all major charger brands and post systems, it is already deployed across sites throughout the UK.
Eliminate wet pours, curing delays, and the associated carbon impact from every installation.
Lightweight composite panels need no lifting equipment, reducing labour cost and handling risk.
Ships on a standard pallet: easy to transport, offload, and carry to position without specialist logistics.
Manufactured from recyclable composite materials to support responsible infrastructure reporting.
Works with Easee, NexBlue, Ratio, epark engineering multi posts, and more, right out of the box.
Pre-marked cable entry points and a modular structure make upgrades and replacements straightforward.
See EV Kube in Action
Watch the product walkthrough, installation guide, and independent review to see exactly how EV Kube works on site.
Interested in EV Kube?
Get in touch to find out how EV Kube can support your next installation.