Charge-M8 Header
EV Kube Case Study: EV Kubes Installed by Local Installer

EV Kube Case Study

EV Kubes Installed by Local Installer


EV Kube flat-pack delivery and installation EV Kube one-person assembly on site EV Kube concrete-free installation complete
  • Installer: Local Installer
  • Product:
  • Charge-M8 EV Kube Foundation

From Delivery to Commission, Faster

Traditional EV charger foundations arrive heavy, require specialist handling, and demand concrete pours that add days to a programme. EV Kube takes a different approach: it ships flat, assembles quickly, and is ready for use without a single wet pour or heavy lift.

This installation shows what that looks like in practice, from the moment the pallet arrives on site to the moment the charger is commissioned.

Simple Logistics, Clean Installation

  • Assembly-ready delivery fits a standard pallet and reduces transport costs
  • One person can assemble and place the unit without lifting equipment
  • No concrete required: no mixing, no curing time, no site disruption

A Greener Way to Install

Removing concrete from the equation reduces the carbon footprint of every installation EV Kube is part of. The recyclable composite material ensures the product aligns with responsible infrastructure delivery from manufacture to end of life.

Charge-M8
Cookies & Policies

We use cookies and similar technologies on our site to ensure the site works effectively, to analyse how users interact with our site and to show relevant content. Some cookies are strictly necessary, others require your consent.

For more information on what cookies we use and how you can control them, please see our Data Protection Policy and Privacy Policy.