EV Kube Case Study
EV Kubes Installed by Local Installer
- Installer: Local Installer
- Product:
- Charge-M8 EV Kube Foundation
From Delivery to Commission, Faster
Traditional EV charger foundations arrive heavy, require specialist handling, and demand concrete pours that add days to a programme. EV Kube takes a different approach: it ships flat, assembles quickly, and is ready for use without a single wet pour or heavy lift.
This installation shows what that looks like in practice, from the moment the pallet arrives on site to the moment the charger is commissioned.
Simple Logistics, Clean Installation
- Assembly-ready delivery fits a standard pallet and reduces transport costs
- One person can assemble and place the unit without lifting equipment
- No concrete required: no mixing, no curing time, no site disruption
A Greener Way to Install
Removing concrete from the equation reduces the carbon footprint of every installation EV Kube is part of. The recyclable composite material ensures the product aligns with responsible infrastructure delivery from manufacture to end of life.