EV Kube Case Study
The Station, Shustoke | Delivered by M J Wallace Limited
- Installer: M J Wallace Limited
- Product:
- Charge-M8 EV Kube Foundation
- epark engineering Multi-Post & Slip-On Barrier
- Zaptec Pro Chargers
- Tap Electric Platform
A Clean, Robust, Future-Ready Installation
M J Wallace Limited delivered a clean, robust and future-ready EV charging installation at The Station, Shustoke. The customer's own feedback said it best: "This is a terrific outcome after how things stood 24 hours ago. Great work!"
The project brought together the Charge-M8 EV Kube Foundation for fast, concrete-free groundworks, epark engineering's Multi-Post and Slip-On Barrier for flexible charger mounting and practical vehicle protection, Zaptec Pro chargers, and the Tap Electric payment platform.
The solution was supplied by UK EV Installer Shop, with support from Kelvelec Electrical Supplies Ltd.
"Collaboration like this helps make commercial EV infrastructure faster to deploy, easier to maintain and ready for the future." — Charge-M8
Related products & brands