EV Kube in Action
One of the EV Kube Installation Cases
6 x Easee 22kW chargers installed faster with EV Kube foundations
Project snapshot
A real world installation featuring 6 × Easee Charge 22kW units mounted on ePark Engineering dual posts, using Charge-M8 EV Kube as the foundation solution on site. The products were sourced via EVelec Limited’s preferred wholesaler through a Kelvelec Electrical Supplies Ltd bundle.
The challenge
Installers and end clients often face three common pain points during EV charger rollouts:
- Groundworks and concrete foundations add time, labour, and site disruption
- Handling heavy, awkward base components slows down teams on site
- Traditional foundations increase total installed cost and create future retrofit headaches
The solution
Charge-M8 EV Kube provided a solid, installer friendly foundation that is engineered for speed, handling, and durability, while supporting a clean supply chain bundle purchase.
Partners involved
- EVelec Limited
- Kelvelec Electrical Supplies Ltd
- ePark Engineering
What happened on site
- 6 × Easee Charge 22kW units installed on ePark Engineering dual posts
- EV Kube used as the foundation solution to reduce groundworks
- Installation workflow simplified for faster rollout and lower total project cost
Real installer feedback
- “We’ve already done a dry fit with some of them, we think they’re great.”
- “Building them now. Decent kit.”
- EV Kube described as “solid, well built, and easy to manoeuvre”.
Results and value delivered
- Reduced groundworks compared with traditional solutions
- Faster installation and easier handling on site
- Lower overall project cost for the end client
- A smarter alternative to traditional concrete foundations
- Strong example of supply chain collaboration and bundled procurement
EV Kube Compatibility & Partner Ecosystem
Built for Real Installers, Not Just Specification Sheets
EV Kube is not designed in isolation.
It is engineered to integrate with leading EV charger brands, multi-post systems, and payment solutions — helping installers build faster, cleaner, and more adaptable sites.
Below are real-world combinations already deployed across the UK.
1. EV Kube + epark engineering Multi Post
Faster installs. Cleaner layouts. Future-ready upgrades.
When combined with epark engineering’s UK-manufactured stainless steel Multi Post with slip-on replacement barrier, EV Kube delivers:
Reduced groundworks
Clean cable routing
Adaptable barrier protection
Simple charger replacement in future
This pairing makes future-proofing straightforward. Install today. Upgrade tomorrow.
Ideal for:
Public charging sites
Commercial car parks
Workplace charging
2. The Complete EV Charging Ecosystem
NexBlue Delta Max + epark Multi Post + EV Kube
Three British innovators solving real installer challenges.
NexBlue Delta Max
Adaptive 1.4–22kW charging
Built-in MID-certified metering
Dynamic Load Management
PEN-fault protection
ISO 15118 ready
epark Multi Post
UK manufactured stainless steel
PAS-compliant
Bespoke mounting plates
Charge-M8 EV Kube
One-person install
No lifting equipment
No concrete required
Lightweight composite
Pre-marked cable entry
Recyclable and ESG-aligned
Together, this ecosystem reduces groundworks, speeds up commissioning, and supports future compliance without complexity.
3. EV Kube + Ratio EV Charger
Modular foundations that adapt across brands
The Ratio EV charger mounted on EV Kube demonstrates:
Clean installation
Lightweight handling
Fast assembly
Corrosion-proof composite durability
Flat-pack delivery
Demonstrated that the EV Kube is compatible with a wide range of chargers and pedestals.